Sunny day breach inundation mapping at maximum pool, Cedar Creek Dam
Project

Cedar Creek Dam

RiskHydro evaluated an existing, unclassified dam within the proposed Cedar Creek community in Creedmoor, NC for Gander Development, LLC. RiskHydro modeled sunny day and spillway design flood breach scenarios, compared breach and non-breach flood conditions to isolate the incremental consequence of dam failure, and used the results to support a Jurisdictional Determination and Hazard Classification (JDHC) request to the NCDEQ Dam Safety Program. The analysis supported an intermediate hazard (Class B) classification, and because the dam falls under the size thresholds in the Dam Safety Law of 1967, that classification made it exempt from state dam safety regulation. The recommendation was approved on the initial submittal.

Location Creedmoor, NC Client Type Private
Client Gander Development, LLC
Mary Lane Holdings, LLC (Owner)
Service Area Dam Safety
Project Type Dam Breach Analysis & Hazard Classification Partnership Year 2026
Project Status Complete Partners
  • Soil & Environmental Consultants, Inc.

Key Project Highlights

The dam sits within Gander Development’s proposed Cedar Creek community. It predates current dam safety regulation and did not appear in the NCDEQ Dam Safety Program inventory, so its jurisdictional status was an open question rather than a matter of record. Gander Development needed to know whether the dam would trigger state regulation before finalizing the community’s layout and road network.

Gander Development wanted to keep the pond as a community amenity, with a greenway around it that would let residents connect with nature. Before committing to that plan, they needed to understand the actual risk the dam posed and what long-term regulatory compliance would cost if the dam were classified as jurisdictional.

Two roadway crossings are also proposed downstream of the dam. Gander Development needed to understand how breach flooding would interact with those crossings before committing to the road network, so that the layout reflected the dam’s actual failure consequences rather than an assumption about them.

Upstream slope and normal pool at Cedar Creek Dam, right abutment.
Upstream slope and normal pool at Cedar Creek Dam, left abutment.
Cedar Creek Dam embankment crest looking across the dam

Project Features

  • NCDEQ JDHC support; intermediate hazard classification and exempt status approved on first submittal
  • Sunny day and spillway design flood (SDF) breach modeling
  • Breach vs. non-breach incremental damage analysis
  • 2D HEC-RAS downstream routing and inundation mapping
  • Vehicle hazard evaluation at downstream road crossing
  • Existing and proposed conditions modeling
  • Site visit and field documentation of existing conditions

Looking Ahead

Exemption under the Dam Safety Law of 1967 is not a property of the dam alone. A dam that falls under the size thresholds is exempt only if it is not high hazard, so the exempt determination rests on the classification, and the classification rests on what is downstream. The determination here reflects the dam and the downstream conditions as they exist today. RiskHydro also evaluated the community as proposed, so Gander Development has that picture in hand while the layout can still change, which is when it is most useful.

That distinction is at the center of where North Carolina’s dam safety rules are heading. The proposed revisions to 15A NCAC 02K, open for public comment through October 16, 2026, would explicitly require that planned future downstream development be considered in hazard classification, would tie road-related consequences to measured traffic volumes rather than road type, and would formally establish incremental damage analysis as a tool for classification and reclassification. A dam that is exempt under current conditions is not necessarily exempt under future ones.

If you own a dam, or you are evaluating land with one on it, contact RiskHydro to discuss what the proposed changes mean for your classification.

“RiskHydro turned a potentially complicated dam safety issue into a clear and manageable path forward. Their analysis was thorough, practical, and approved by NCDEQ without revisions, allowing our team to continue planning with confidence.” – Jonathan Parsons, PLA, NC-GC, Director of Community Planning, Gander Development, LLC