Modeled 25-year compound flooding in the Duffyfield neighborhood showing flood depth and building impacts.
Project

Duffyfield Canal Restoration Master Plan

RiskHydro developed an integrated 1D–2D PCSWMM model to support the Duffyfield Canal Restoration Master Plan in New Bern, North Carolina. The model represents nearly 2 square miles of urban watershed, including the Duffyfield Canal and connected drainage system, stormwater pump stations, overland flow paths, and the influence of elevated Neuse River water levels within a single hydraulic framework. The project is funded through the North Carolina Resilient Coastal Communities Program (RCCP), administered by the North Carolina Department of Environmental Quality’s Division of Coastal Management.

Using rain-on-grid modeling, RiskHydro evaluated existing and future flood conditions, quantified how downstream water levels affect drainage throughout the neighborhood, and tested conceptual improvement strategies ranging from pump station improvements and interior pumping to regional stormwater storage and distributed neighborhood-scale stormwater controls.

RiskHydro also supported the project’s community engagement by turning the technical model into an interactive tool residents could explore themselves. At public meetings, residents moved between present-day rainfall scenarios, elevated river conditions, future conditions with sea level rise, and proposed improvements while comparing the model results with flooding they have experienced firsthand. Their feedback provided another source of information for the master-planning process and helped identify drainage features and problem areas that may not be fully represented in existing mapping.

Location New Bern, NC Client Type Municipal
Client City of New Bern Service Area Stormwater & Watershed Planning
Project Type Flood Resilience & Stormwater Master Planning Partnership Year 2025-2026
Project Status In Progress Partners
  • TRC Engineers
  • Surface 678

Key Project Highlights

Flooding in the Duffyfield neighborhood is not controlled by rainfall alone. The canal drains toward the Neuse River through a low-lying system of storm drains, road crossings, pump stations, wetlands, and downstream conveyance features. When receiving-water levels rise, gravity drainage becomes restricted and the existing pumping system can become less effective, allowing runoff to accumulate within the neighborhood.

That interaction makes the problem difficult to understand using conventional pipe calculations or isolated flood maps. The City needed a model that could represent rainfall, underground drainage, canal conveyance, pump station operation, surface flooding, and elevated downstream water levels together.

The project also needed to communicate those complicated interactions clearly to residents who experience the flooding. A successful master plan had to combine technical analysis with local knowledge of streets, ditches, pipes, and drainage paths that may not be apparent in available mapping.

High-resolution land cover mapping used to support hydrologic and hydraulic modeling of the Duffyfield Canal watershed.
Residents exploring RiskHydro’s interactive flood model at the Duffyfield Canal Restoration community meeting in New Bern.
Map showing modeled changes in flood depth with the proposed Henderson Park pump station in the Duffyfield neighborhood.

Project Features

  • Integrated 1D–2D rain-on-grid hydraulic modeling using PCSWMM

  • Existing, compound, and future-condition analysis

  • Pump station, canal, storm drain, and overland-flow simulation

  • Five conceptual flood-mitigation strategies evaluated

  • Interactive flood-model demonstrations for public engagement
  • Building and roadway flood-impact mapping

“RiskHydro has become our go-to partner for complex hydrologic and hydraulic modeling needs. Their team has an excellent eye for detail, is incredibly responsive, and delivers a final product that is both technically sound and easy to understand.” – Luke Baker, PG, Water Resources Lead, TRC Engineers, Inc.