Swannanoa Greenway Feasibility Study

RiskHydro is supporting Equinox Environmental on a feasibility study for the Swannanoa Greenway, a nearly seven-mile trail led by Friends and Neighbors of Swannanoa (FANS) and envisioned as part of the Fonta Flora State Trail. The corridor extends from Grovestone Road to Warren Wilson College in Buncombe County, NC. After Hurricane Helene, the team is reconsidering trail alignments and stream crossings in light of changed river conditions. RiskHydro is reviewing the effective flood models and mapping Non-Encroachment Areas. We are also using a post-Helene 2D HEC-RAS model to flag where conditions have shifted and to identify the permitting path for each crossing.

Location Buncombe County, NC Client Type Nonprofit
Client Friends and Neighbors of Swannanoa (FANS) Service Area Floodplain Management
Project Type Floodplain Permitting & Crossing Feasibility Partnership Year 2026
Project Status In Progress Partners
  • Equinox Environmental

Key Project Highlights

Hurricane Helene changed conditions along the Swannanoa River and its tributaries, while effective flood models and maps reflect earlier conditions. Several potential crossings are in mapped floodways or Non-Encroachment Areas. These areas are subject to floodplain rules that generally require a no-rise analysis or FEMA approval for a map revision for encroachments to proceed.

Post-Helene bridge replacements and future flood studies may also change effective mapping before the greenway reaches design. That could affect crossing locations, permitting requirements, and the analysis needed for approval.

New bridge over a river, with fresh riprap, erosion control matting, and silt fence on the bank.
Map of terrain elevations shaded red to blue, overlaid with a computational mesh along the river valley and nearby roads.
Rocky river channel through dense regrowing vegetation, with woody debris in the channel and a cleared floodplain area beyond.

Project Features

  • Feasibility support for a nearly seven-mile greenway corridor
  • Effective flood model review and Non-Encroachment Area mapping
  • Post-Helene 2D HEC-RAS model evaluation
  • Crossing-by-crossing floodplain permitting review
  • Coordination with Buncombe County and North Carolina Emergency Management
  • Identification of potential floodplain benching and other mitigation measures

Looking Ahead

The feasibility review is helping the team identify where crossing concepts may need refinement and where additional modeling or mitigation may be needed. As the greenway advances, the findings can inform alignment and design decisions and help focus future permitting work.